Construction support and tower solutions for project-specific requirements.
SmartWave supports onshore wind opportunities where installation planning, heavy-lift execution, logistics and tower supply must be coordinated against a defined project schedule and technical basis.

Hybrid Tower Field Execution
Representative 165 MW onshore wind project with 25 turbines and partner-manufactured / installed hybrid towers.

Prefabricated Tower Production
Factory-based concrete tower segment production illustrating the manufacturing side of the end-to-end tower solution.
Onshore construction support
SmartWave can support project teams with scope development, execution-resource alignment and construction coordination for wind farm installation activities. The execution network represents more than 4,000 wind turbine installations and includes international onshore wind construction experience across multiple overseas markets.
- Site and schedule review
- Installation sequencing
- Heavy-lift and crane interface planning
- Logistics interface coordination
- Execution partner alignment
Wind power concrete tower products
SmartWave’s execution network includes prefabricated wind power concrete tower capability spanning research and development, manufacturing, transportation and hoisting. For North American projects evaluating concrete or hybrid tower solutions, SmartWave can help structure technical and commercial discussions around tower design basis, local codes, transport constraints, manufacturing strategy, site assembly and installation requirements.
A project-specific approach
We do not present a one-size-fits-all product. Each tower or construction opportunity should be matched to the turbine platform, hub height, local design criteria, transport route and field assembly plan.